Text 623-738-5406Text Free Job Cost WorksheetFree worksheet

Bookkeeping for Plumbers

Service vs. new-construction margins, truck stock that never gets charged to the job, and emergency work priced like daytime work. I keep the books for plumbing companies so every kind of work shows what it really earns.

QuickBooks Online certified · Certified Tax-Ready Books Specialist

The problems, and what changes.

Books closed and reconciled by the 15th of the following month, once you’ve answered open questions and sent needed documents. Your books are set up to show each job, and you get a plain-English report on profit, cash and what changed.

  • Service and new construction in one pile

    Service work and new construction carry very different margins. Mixed together, the numbers can’t tell you which side of the business is carrying the other.

    What changes: Service and new construction are tracked apart, each with its own margin, every month.

  • Truck stock that never reaches the invoice

    Parts come off the truck and go into the job, but the cost never gets charged to it. The job looks more profitable than it was.

    What changes: Parts used on a job are charged to that job, so its real cost shows up before you quote the next one.

  • Emergency and after-hours work priced like daytime

    A call at 10pm costs you overtime. If it’s priced from regular pay, the busiest nights can be the least profitable.

    What changes: You see what after-hours work really costs, and price it from overtime pay, not regular pay.

Three kinds of plumbing money, three lines in your books.

Kept apart in QuickBooks Online or Xero, so you can see which work pays and where parts go missing.

Service calls

Same-day and emergency work. After-hours calls priced from overtime pay.

one line in your books

New construction

Bigger jobs with their own margin, tracked separately from service.

one line in your books

Truck stock

Parts pulled from the truck, charged to the job that used them.

restocked, then charged to the job

Free: the Job Cost Worksheet.

It compares what you estimated a job would cost with what it actually cost, line by line, so you can see exactly where the profit went. The Excel worksheet has a tab each for electrical, plumbing, HVAC and painting jobs, with an example job filled in, room for up to 20 crew members, and red flags on the lines that went over.

Job Pricing Calculator

Enter what the job costs you and the margin you want to keep. You’ll see the price to quote right away, and what the common markup mistake would cost you. No email needed.

Materials, labor and subcontractors
The share of the price you want to keep, as a percent
Added to the job cost

Price to quote$1,428.57That’s a 42.9% markup on cost, and $428.57 gross profit.

This is gross margin: it covers the job’s own costs. Net profit is what’s left after overhead too; the Rate Builder tab in the free Job Cost Worksheet works that out.

The common mistake

Add 30% as a markup instead, and you’d quote $1,300.00: only a 23.1% margin, and $128.57 less profit on this job.

Price = Cost ÷ (1 − Margin). Markup = Margin ÷ (1 − Margin). For planning and education only; not tax, legal or financial advice. Examples use illustrative numbers. Your results depend on your own costs, rates and records.

Free downloads, by email

Get the Job Cost Worksheet and the Job Pricing Cheat Sheet.

The worksheet (Excel) compares estimate and actual on every job, with a tab for each trade and a Rate Builder for your hourly rate. The cheat sheet (PDF) covers markup vs. margin, labor cost, overhead, flat-rate calls and the costs each trade forgets. I’ll email you the links, plus your result.

All four fields are required.

I’ll also send a few short emails about pricing and job costing. Unsubscribe any time. Privacy Policy

Costs that slip out of the quote.

From my Job Pricing Cheat Sheet. Each one is a cost you pay that the customer never sees on the invoice.

  • Truck stock used on the job but never charged to it
  • Expansion tanks, pans, venting and code upgrades
  • Haul-away of old fixtures and water heaters
  • Excavation and concrete patching

Miles in the truck add up.

Emergency calls, supply runs and return trips for parts put a lot of miles on a plumbing truck. With Receipt Management, the Terrapin app keeps a mileage log alongside your receipts. Ask your CPA or tax preparer how those miles apply to your taxes.

See Receipt Management

From the Compass Calibration

What a finding reads like.

Every finding in your written roadmap says what’s broken, what it’s costing you and how to fix it. These show the kind of thing I write up.

Example findingsExample, not a client’s file
  1. FoundTruck stock bought in bulk and never charged to a job.
    What I’d doTrack parts to the jobs that used them.
  2. FoundService calls and new construction in one income line.
    What I’d doTrack each on its own, so each shows its own margin.
  3. FoundPersonal purchases booked as business expenses.
    What I’d doMove them to owner’s draw.

Recent work

Recent work, without my client’s name

A home service client saved over $6k on card fees from January to October 2025, after I helped introduce them to a new credit card payment processor.

Read my reviews on Google

Questions plumbers ask.

Do plumbers need job costing?

Yes, especially if you do both service work and new construction, because the two can have very different margins. Job costing puts every part and labor hour on the job it belongs to, so you can see which work actually makes money. Start with the free Job Costing Guide for QuickBooks Online or Xero.

How much does bookkeeping cost for a plumbing company?

True North’s monthly bookkeeping starts at $500 a month, with books closed and reconciled by the 15th of the following month, as long as open questions are answered and documents sent on time. Book a free 15-minute Numbers Check or text 623-738-5406 to talk through what your company needs.

How should I track truck stock and parts used on jobs?

Put parts on the job they were used on. When you buy for a specific job, pick that job on the bill or expense. For truck stock, record what each job used (a parts list on the work order is enough to start). Otherwise those parts sit in overhead and every job looks more profitable than it is.

How should I price emergency and after-hours plumbing work?

Start from what those hours really cost you, including overtime pay, payroll taxes and workers’ comp, then price for your target margin. The free Job Cost Worksheet includes an overtime multiplier and a rate builder for this math.

When is a plumbing company’s slow season?

Plumbing is often steadier than other trades, but it has gaps: builder work slowing down, or a big customer paying 60 to 90 days late. The free Slow-Season Cash Reserve Calculator shows how much cash to set aside for those stretches.

Do you work with my payroll provider?

Yes. True North works with your payroll provider, including ADP, Gusto, QuickBooks Payroll and others, so you don’t have to switch.

Questions about your numbers? Text me.

Most trades owners would rather text than call. Send a question from the truck and I’ll get back to you, or book a free 15-minute Numbers Check call if you’d rather talk it through.

Text StephenFree worksheet